How Do I Prepare My Yard for a New Gate

Three width readings, one at the top, one at the middle and one at the bottom, rarely agree on an existing opening, and every site walk logged by gate installation carlsbad the derek bordeaux group shows the same thing: the posts lean. Metal gate work in Carlsbad, CA starts with the tape measure, because the narrowest reading sets the width of the frame and everything else follows from it.
Measuring the Opening

Take the three readings and write them down before ordering any steel. Build to the narrowest one, minus room for hinge clearance and latch clearance. A gate made to the exact opening will bind once it is hung, since the hinges and the latch each take up space. No existing post should be assumed strong enough to carry a gate. Each one needs checking for plumb, rot and how firmly it sits in the ground.
Slope Across the Swing Path

Ground that rises or falls across the arc of a swing gate causes trouble on a side-yard walk gate just as it does on a driveway. There are three ways to deal with it. Leave a larger gap under the bottom rail, hang the gate to swing toward the downhill side, or use rising hinges that lift the gate as it opens. Which one fits depends on how far the grade changes and how the picket spacing looks with a taller gap.
Soil and Footings
Sandy soil is common near the coast, including the ground around Agua Hedionda Lagoon and Batiquitos Lagoon, and it holds a post less firmly than dense soil. A swinging gate levers on its hinge post every time it opens, so a wider footing helps resist that pull. Pushing a probe bar into the ground at the post location tells you more than guessing from the surface.
Lines Under the Ground
Yards often have shallow irrigation lines and low voltage lighting wire running close to walkways. Find them before anyone digs a hole. If the plan includes an operator or a gate opener, mark the route for power and control conduit at the same time, so a trench is not opened twice.
Roots and Water
Roots and vegetation along the fence line push posts out of plumb over time, so clear them from the footing area. Then watch where water goes after rain. A post set in a low spot that stays wet is more prone to rot or corrosion at the base, and the marine layer that keeps morning ground damp in Carlsbad does not help. Galvanized tubing and a powder coat finish slow that down, but neither makes up for a footing sitting in standing water. Move the post, or regrade and add drainage, before the concrete goes in.